East Nippon Expressway Co., Ltd. Corporate Site

Construction regulation information

This table lists construction regulations that are expected to cause customers inconvenience among construction regulation information in Hokkaido.

The construction regulation information that is posted is as follows.
· "Road Closed"
· "Temporary stop on Expressway "One-sided alternate traffic regulation"
· Implementing traffic regulations through day and night "Day and night continuous lane regulation"

Also, the schedule for closing the ETC laneExternal link: Another window displayPlease confirm with.

Please note that constructions requiring emergency may be carried out without prior notice, so before going out,External link: Another window displayPlease confirm the latest situation on the website of.

(令和元年7月18日現在)

Date Time Road name direction section Regulatory content Construction contents Details
7月18日(木)
~
7月19日(金)
22
~
Next 6 o'clock
DOTO EXPWY Both directions Tokachi Shimizu IC

Soundless Obihiro IC
Road Closed Road surface repair work and equipment inspection 予備日:7月22日(月)~8月6日(火)
The latest regulation information,External link: Another window displayPlease see.
For details,HerePlease confirm.
【7月18日更新】
7月18日(木)
~
July 22 (Mon)
22
~
Next 6 o'clock
DO-O EXPRESSWAY Both directions National stitch IC

Toyoura IC
Road Closed Tunnel lighting renewal, road surface repair work Reserve date: July 23 (Tuesday) to July 26 (Fri)
The latest regulation information,External link: Another window displayPlease see.
For details,HerePlease confirm.
【7月18日更新】
July 23 (Tuesday)
~
August 6 (Tuesday)
August 21 (Wed)
~
August 23 (Fri)
22
~
Next 6 o'clock
DO-O EXPRESSWAY Both directions Oshamanba IC

Toyoura IC
Road Closed Tunnel lighting renewal, road surface repair work The latest regulation information,External link: Another window displayPlease see.
For details,HerePlease confirm.
[June 24 update]
Adobe Systems' plug-in software "Acrobat Reader (Japanese version)" is required to view PDF files. If you do not havePlease use it.